Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
色噜噜狠狠色综合成人网| 天天做天天摸天天爽天天爱| 香港a片| 亚洲AV永久无码精品国产精品| 精品免费囯产一区二区三区四区| 女人高潮被爽到呻吟在线观看| 天天搡天天狠天干天啪啪| 国产无遮挡又黄又爽在线视频| 丰满少妇高潮惨叫久久久一| 金梅瓶在线观看| 天天影视色香欲综合久久| ying荡的雯雯第三部分| 欧美18videosex性欧美| 99偷拍视频精品一区二区| 女子全裸遭陌生人闯入| 久久精品中文字幕一区| 亚洲色欲久久久综合网东京热| 欧美又大粗又爽又黄大片视频 | 韩国电影办公室3免费完整版| 女人十八毛片A片久久18| 久久精品麻豆日日躁夜夜躁 | 久久9精品区-无套内射无码| 久久久久久AV无码免费网站| 国产福利一区二区三区在线观看| 疯狂做受xxxx高潮欧美日本| 亚洲熟妇无码爱v在线观看| 亚洲av激情无码专区在线播放 | 日本va欧美va精品发布| 国产亚洲精品无码成人| 成人区色情综合小说| 美女高潮黄又色高清视频免费| 日韩久久无码免费毛片软件| 国产强奷伦奷片| 唐三偷喝宁荣荣乳液污黄文| 办公室扒开奶罩揉吮奶头a片| VIDEOS丰满欧美熟妇| 久久久国产一区二区三区 | 漂亮人妻被强了bd影片| 日韩无码专区| 随时随地都能干的学校教师| 少妇高潮无套内谢麻豆传|